Full Remodel
Full Bathroom Remodel
The room taken back to studs and rebuilt, typically eight to twelve weeks of construction once materials land
Services
From a $12,000 shower conversion in a 1950s tract house to a $95,000 primary suite in Los Altos. Each page covers what the work involves, what it costs here and where the money goes.
Most Mountain View bathroom remodeling falls into one of these. If yours does not fit neatly, that is normal, and the walkthrough sorts it out.
Full Remodel
The room taken back to studs and rebuilt, typically eight to twelve weeks of construction once materials land
Primary Bath
Larger suite work: separate shower and tub, double vanity, the projects where design time earns its keep
Shower Conversion
Pulling an unused tub or a tired fiberglass enclosure and building a properly waterproofed tile shower
Small Bath
Hall baths and powder rooms in the 35 to 55 square foot range, where every layout decision shows
Eichler and Mid-Century
Post-and-beam houses with radiant slabs and no attic, where a standard bathroom scope does not apply
Aging in Place
Curbless entry, real blocking behind the grab bars, wider doors, and a room that does not look clinical
Tile and Waterproofing
The standalone scope for shower walls, floors and surrounds, held to the same membrane standard as a full build
Plenty of people arrive certain they need a full gut and leave with a shower conversion, or the other way around. The deciding factors are usually structural rather than aesthetic: whether the layout has to change, whether the room sits on a slab, whether the supply lines are galvanised and overdue, and whether anyone in the house is planning to still be there in twenty years.
The cost calculator gives a range for each scope, and the Mountain View remodel guide walks the whole decision through from the beginning.
Call (650) 966-5276, or send the details through the form and a local remodeler prices the job up. The quote is free either way.