Cutting an Eichler Slab Without Hitting the Heating
Mountain View has roughly 250 Eichlers with hot water tubing cast into the floor slab. How the tubing gets located before any concrete is cut, and why.
Service
The standalone scope for shower walls, floors and surrounds, held to the same membrane standard as a full build.
Some homeowners have the rest of the project handled and need the tile and waterproofing done properly, whether the demolition is already finished or the other trades are lined up. It is a normal scope to quote on its own, and it is the part of a bathroom where shortcuts stay hidden the longest. A shower wall and floor with a niche typically runs $6,000 to $16,000 depending on tile and complexity, and takes four to eight working days plus cure time. The sequence that protects the work is fixed: plumbing rough-in inspected and signed off, substrate correct and flat, membrane installed to specification, flood test, then tile.
A local remodeler walks the room with you, checks what is behind the wall and under the floor, and follows up with a written price broken down by scope.
The things homeowners ask most often before committing to tile and waterproofing work.
The same work runs across the north Santa Clara Valley and the lower Peninsula. Each area page covers the housing stock and the permit process for that specific city.
Mountain View has roughly 250 Eichlers with hot water tubing cast into the floor slab. How the tubing gets located before any concrete is cut, and why.
Cost recovery data, what a dated bathroom does to a listing in a two-million-dollar market, and why resale is usually the wrong reason to do the work at all.
A $1,000 deposit cap whatever the project costs, a written contract above $500, and a lien that can attach even after you have paid the contractor in full.
Where a house has two bathrooms due for work, doing both under one permit and one mobilisation is usually cheaper than two separate projects a year apart, and it is worth asking for both prices at the same walkthrough.
The room taken back to studs and rebuilt, typically eight to twelve weeks of construction once materials land
Larger suite work: separate shower and tub, double vanity, the projects where design time earns its keep
Pulling an unused tub or a tired fiberglass enclosure and building a properly waterproofed tile shower
Hall baths and powder rooms in the 35 to 55 square foot range, where every layout decision shows
Call (650) 966-5276, or send the details through the form and a local remodeler prices the job up. The quote is free either way.