Full Bathroom Remodel
The room taken back to studs and rebuilt, typically eight to twelve weeks of construction once materials land
Service Area
Mountain View is the home market and most projects that come through this site are inside the city. About a third of the housing here went up in the 1950s and 1960s, which means compact hall bathrooms, concrete slab floors and original plumbing that has now been in service for sixty or seventy years. Layered on top of that are two Eichler tracts, a substantial 1970s apartment and townhouse stock, and everything built around the Caltrain corridor since 2000. The right scope depends far more on which of those your house belongs to than on which street it is on.
The most common project in the city is a hall bathroom in a 1950s or 1960s tract house. Census figures put 15.3 percent of Mountain View housing in the 1950s and 17.5 percent in the 1960s, and those houses were built to a pattern: one compact bathroom off the hallway, a tub and shower combination against the wet wall, a single vanity opposite, and a slab underneath the whole thing. The typical scope is a walk-in shower conversion, a new vanity and counter, new floor tile, better lighting and a properly ducted exhaust fan. Most land between $18,000 and $30,000 and take three to six weeks of construction.
The Eichlers are their own category. Mountain View has two tracts, the Fairview tract inside Monta Loma, built in 1954 to Jones and Emmons designs, and the smaller Bell Meadows tract to the south by Claude Oakland. Together they account for somewhere around 250 to 275 houses. Post-and-beam construction with a low-slope roof means there is no attic to run a duct or a light through, and hot water tubing cast into the slab means the floor cannot simply be cut open. These projects run $35,000 to $75,000, and the premium is planning rather than finish.
The condominiums and townhouses around the San Antonio and Whisman corridors are a different exercise again. Footprints are small, the finish expectations are high, and the association rules matter as much as the building code: work hours, elevator booking, floor protection through the common areas, water shutoff coordination with neighbours and, in most buildings, a written approval before anything starts. A contractor who has not worked in a Mountain View association building before finds all of this out the expensive way.
Whatever the vintage, the permit path is the same. The Community Development Department Building Division handles residential building permits, and the city requires one for essentially any bathroom remodel; the one exception is swapping a toilet for a 1.28 gallon per flush replacement in the same position. Permit fees for a bathroom run roughly $800 to $1,100 including inspections. Applications and inspection bookings both run through the city development permits portal, and the contractor handles the whole sequence through to a closed final inspection.
A walkthrough at the property, then a written price broken down by scope. The quote costs nothing either way.
Each page covers what the work involves and what it costs in this market.
The room taken back to studs and rebuilt, typically eight to twelve weeks of construction once materials land
Larger suite work: separate shower and tub, double vanity, the projects where design time earns its keep
Pulling an unused tub or a tired fiberglass enclosure and building a properly waterproofed tile shower
Hall baths and powder rooms in the 35 to 55 square foot range, where every layout decision shows
Post-and-beam houses with radiant slabs and no attic, where a standard bathroom scope does not apply
Curbless entry, real blocking behind the grab bars, wider doors, and a room that does not look clinical
The standalone scope for shower walls, floors and surrounds, held to the same membrane standard as a full build
A $1,000 deposit cap whatever the project costs, a written contract above $500, and a lien that can attach even after you have paid the contractor in full.
California caps showerheads at 1.8 gallons per minute, basin taps at 1.2 and toilets at 1.28 per flush. All tighter than federal, and it catches online orders.
Mountain View has roughly 250 Eichlers with hot water tubing cast into the floor slab. How the tubing gets located before any concrete is cut, and why.
Call (650) 966-5276, or send the details through the form and a local remodeler prices the job up. The quote is free either way.