Cutting an Eichler Slab Without Hitting the Heating
Mountain View has roughly 250 Eichlers with hot water tubing cast into the floor slab. How the tubing gets located before any concrete is cut, and why.
Service
Larger suite work: separate shower and tub, double vanity, the projects where design time earns its keep.
A primary bathroom remodel is the bigger, more design-driven end of the work: a separate walk-in shower and soaking tub, a double vanity, sometimes an enclosed toilet compartment and a linen closet. In Mountain View these projects generally run $45,000 to $95,000, and the higher end reflects Peninsula pricing on glass, stone and cabinetry rather than anything exotic in the construction. The design phase matters more here than on a hall bathroom, because a primary suite has enough room for layout choices to be wrong. Construction runs ten to sixteen weeks, longer if walls move or the roof structure is opened for a skylight.
A local remodeler walks the room with you, checks what is behind the wall and under the floor, and follows up with a written price broken down by scope.
The things homeowners ask most often before committing to primary bath work.
The same work runs across the north Santa Clara Valley and the lower Peninsula. Each area page covers the housing stock and the permit process for that specific city.
Mountain View has roughly 250 Eichlers with hot water tubing cast into the floor slab. How the tubing gets located before any concrete is cut, and why.
Cost recovery data, what a dated bathroom does to a listing in a two-million-dollar market, and why resale is usually the wrong reason to do the work at all.
A $1,000 deposit cap whatever the project costs, a written contract above $500, and a lien that can attach even after you have paid the contractor in full.
Where a house has two bathrooms due for work, doing both under one permit and one mobilisation is usually cheaper than two separate projects a year apart, and it is worth asking for both prices at the same walkthrough.
The room taken back to studs and rebuilt, typically eight to twelve weeks of construction once materials land
Pulling an unused tub or a tired fiberglass enclosure and building a properly waterproofed tile shower
Hall baths and powder rooms in the 35 to 55 square foot range, where every layout decision shows
Post-and-beam houses with radiant slabs and no attic, where a standard bathroom scope does not apply
Call (650) 966-5276, or send the details through the form and a local remodeler prices the job up. The quote is free either way.