Full Bathroom Remodel
The room taken back to studs and rebuilt, typically eight to twelve weeks of construction once materials land
Service Area
Los Altos Hills sits in the hills south-west of Mountain View, a town with rural-estate zoning, minimum lot sizes measured in acres and no commercial district to speak of. Houses are large and mostly custom, which means bathroom projects here are almost always primary suites or guest suites built to a specific design rather than a standard scope pulled off a shelf.
The typical project is a primary bathroom at $80,000 to $150,000 or more, with custom cabinetry, natural stone, a large curbless shower and a freestanding tub. Lead times drive the schedule more than the trades do: custom vanities run six to ten weeks and imported stone four to six, and on this kind of project both are usually on the critical path. Twelve to sixteen weeks of construction is normal, and longer is not unusual.
Hillside sites bring practical complications that flatland houses do not. Access for deliveries and skips is often tight on narrow private roads, staging space can be limited, and houses built into a slope frequently have split levels, stepped foundations and plumbing runs that took an unusual path when the house was built. All of it is workable, and all of it belongs in the walkthrough rather than the middle of the project.
Many Los Altos Hills properties are on septic systems and some are on well water. Neither prevents a bathroom remodel, but both belong in the conversation early. Adding fixture count can affect septic capacity assumptions, and well pressure influences which shower valves and fixtures make sense. These are questions to settle during design, not after the tile is ordered.
A walkthrough at the property, then a written price broken down by scope. The quote costs nothing either way.
Each page covers what the work involves and what it costs in this market.
The room taken back to studs and rebuilt, typically eight to twelve weeks of construction once materials land
Larger suite work: separate shower and tub, double vanity, the projects where design time earns its keep
Pulling an unused tub or a tired fiberglass enclosure and building a properly waterproofed tile shower
Hall baths and powder rooms in the 35 to 55 square foot range, where every layout decision shows
Post-and-beam houses with radiant slabs and no attic, where a standard bathroom scope does not apply
Curbless entry, real blocking behind the grab bars, wider doors, and a room that does not look clinical
The standalone scope for shower walls, floors and surrounds, held to the same membrane standard as a full build
A $1,000 deposit cap whatever the project costs, a written contract above $500, and a lien that can attach even after you have paid the contractor in full.
California caps showerheads at 1.8 gallons per minute, basin taps at 1.2 and toilets at 1.28 per flush. All tighter than federal, and it catches online orders.
Mountain View has roughly 250 Eichlers with hot water tubing cast into the floor slab. How the tubing gets located before any concrete is cut, and why.
Call (650) 966-5276, or send the details through the form and a local remodeler prices the job up. The quote is free either way.