Full Bathroom Remodel
The room taken back to studs and rebuilt, typically eight to twelve weeks of construction once materials land
Service Area
Sunnyvale adjoins Mountain View to the east and is the single closest match to it in housing terms. Both cities filled in with tract housing through the 1950s and 1960s to serve the same employers, both have a large stock of compact hall bathrooms on slab floors, and both have added substantial condominium and apartment density since. Projects that work in one usually translate directly to the other.
The bread-and-butter Sunnyvale project is the same as the Mountain View one: a 1950s or 1960s hall bathroom with a tub and shower combination, a small single vanity and dated tile, converted to a walk-in shower with new fixtures, new floor and proper ventilation. Expect $18,000 to $30,000 and three to six weeks. Where a household is keeping the tub, a full tiled surround with a modern valve lands in a similar range.
Sunnyvale has a large stock of 1970s and 1980s townhouses and condominiums, particularly toward the eastern side of the city. These come with the association considerations that any attached housing brings: shutoff coordination, work-hours restrictions, protection through shared circulation and written approval before starting. The bathrooms themselves are usually straightforward; the building rules are what shape the schedule.
Sunnyvale issues its own building permits through its own one-stop permit centre rather than through the county, and the requirements for a bathroom are broadly similar to Mountain View: a permit for anything past cosmetic, inspections at rough-in and final, and the same statewide water efficiency and electrical requirements. Fees and review times differ between the two cities, so the schedule should be set against the specific jurisdiction.
A walkthrough at the property, then a written price broken down by scope. The quote costs nothing either way.
Each page covers what the work involves and what it costs in this market.
The room taken back to studs and rebuilt, typically eight to twelve weeks of construction once materials land
Larger suite work: separate shower and tub, double vanity, the projects where design time earns its keep
Pulling an unused tub or a tired fiberglass enclosure and building a properly waterproofed tile shower
Hall baths and powder rooms in the 35 to 55 square foot range, where every layout decision shows
Post-and-beam houses with radiant slabs and no attic, where a standard bathroom scope does not apply
Curbless entry, real blocking behind the grab bars, wider doors, and a room that does not look clinical
The standalone scope for shower walls, floors and surrounds, held to the same membrane standard as a full build
A $1,000 deposit cap whatever the project costs, a written contract above $500, and a lien that can attach even after you have paid the contractor in full.
California caps showerheads at 1.8 gallons per minute, basin taps at 1.2 and toilets at 1.28 per flush. All tighter than federal, and it catches online orders.
Mountain View has roughly 250 Eichlers with hot water tubing cast into the floor slab. How the tubing gets located before any concrete is cut, and why.
Call (650) 966-5276, or send the details through the form and a local remodeler prices the job up. The quote is free either way.