- Category
- Contracts
- Published
California Contract Rules That Surprise Newcomers
A $1,000 deposit cap whatever the project costs, a written contract above $500, and a lien that can attach even after you have paid the contractor in full.
Field Notes
The guides cover whole decisions. These are the narrower pieces: a contract rule, a construction quirk of one housing type, a line item that surprises people.
A $1,000 deposit cap whatever the project costs, a written contract above $500, and a lien that can attach even after you have paid the contractor in full.
Mountain View has roughly 250 Eichlers with hot water tubing cast into the floor slab. How the tubing gets located before any concrete is cut, and why.
The median Mountain View home dates to 1962, and the tract houses of that era share one bathroom pattern that predicts most of a remodel.
Post-and-beam houses and flat-roofed additions leave nowhere to run a duct. The two routes that work, the one that ruins a roof, and how fans get sized.
Over half of Mountain View housing predates 1980. Asbestos and lead testing runs $300 to $800 before demolition, and costs far more discovered mid-project.
Cost recovery data, what a dated bathroom does to a listing in a two-million-dollar market, and why resale is usually the wrong reason to do the work at all.
Call (650) 966-5276, or send the details through the form and a local remodeler prices the job up. The quote is free either way.