Cutting an Eichler Slab Without Hitting the Heating
Mountain View has roughly 250 Eichlers with hot water tubing cast into the floor slab. How the tubing gets located before any concrete is cut, and why.
Service
Post-and-beam houses with radiant slabs and no attic, where a standard bathroom scope does not apply.
Mountain View has a significant stock of mid-century modern houses, including several Eichler tracts, and their bathrooms do not behave like anything else in the city. The construction is post-and-beam with an exposed or low-slope roof, no attic above and a concrete slab below, and in most of them the original heating is hot water circulating through tubing cast into that slab. Every one of those features constrains a bathroom remodel. There is nowhere overhead to run a duct or a recessed can, there is nowhere below to run a drain, and cutting the slab carelessly puts a hole in the heating system. Projects generally run $35,000 to $75,000. The premium is not decorative, it is the cost of working within the structure instead of against it.
A local remodeler walks the room with you, checks what is behind the wall and under the floor, and follows up with a written price broken down by scope.
The things homeowners ask most often before committing to eichler and mid-century work.
The same work runs across the north Santa Clara Valley and the lower Peninsula. Each area page covers the housing stock and the permit process for that specific city.
Mountain View has roughly 250 Eichlers with hot water tubing cast into the floor slab. How the tubing gets located before any concrete is cut, and why.
Cost recovery data, what a dated bathroom does to a listing in a two-million-dollar market, and why resale is usually the wrong reason to do the work at all.
A $1,000 deposit cap whatever the project costs, a written contract above $500, and a lien that can attach even after you have paid the contractor in full.
Where a house has two bathrooms due for work, doing both under one permit and one mobilisation is usually cheaper than two separate projects a year apart, and it is worth asking for both prices at the same walkthrough.
The room taken back to studs and rebuilt, typically eight to twelve weeks of construction once materials land
Larger suite work: separate shower and tub, double vanity, the projects where design time earns its keep
Pulling an unused tub or a tired fiberglass enclosure and building a properly waterproofed tile shower
Hall baths and powder rooms in the 35 to 55 square foot range, where every layout decision shows
Call (650) 966-5276, or send the details through the form and a local remodeler prices the job up. The quote is free either way.